{"id":1124,"date":"2019-08-28T09:15:11","date_gmt":"2019-08-28T13:15:11","guid":{"rendered":"https:\/\/www2.whoi.edu\/site\/itp\/?page_id=1124"},"modified":"2021-07-20T11:30:23","modified_gmt":"2021-07-20T15:30:23","slug":"itp-7-deployment","status":"publish","type":"page","link":"https:\/\/www2.whoi.edu\/site\/itp\/data\/completed-missions\/itp-7-overview\/itp-7-deployment\/","title":{"rendered":"ITP 007 Deployment"},"content":{"rendered":"\r\n\t<h1>ITP 7 Deployment Operations<\/h1>\r\n\t<p>The first ITP deployed in the Eurasian side of the Arctic Ocean was installed as part of a buoy cluster (or Ice Based Observatory) as a component of the 2007 NPEO.\u00a0 As in previous years, NPEO operated from the Russian ice camp Barneo, which is installed every March-April primarily for commercial tourist purposes.\u00a0 Transport for the NPEO scientists and gear to the North Pole ice camp was through Resolute and Alert, Canada using first a Hawker aircraft, and later a Twin Otter.\u00a0 While the Hawker was supposed to carry all of the NPEO project equipment to Barneo, a crack that formed in the runway after a series of storms at Barneo limited the length of the runway so that only the Twin Otter (with reduced payload) could be used.\u00a0 Consequently some of the NPEO field program had to be abandoned for the year, but installation of the buoy cluster continued using two Twin Otter flights.<\/p>\r\n<p>The first half of our deployment team and half of our buoy gear (IMB and Weatherex) were transported from Alert to Barneo (about 60 miles from the North Pole) on April 22.\u00a0 A location on an 1.5 icefloe several hundred meters from Barneo camp was selected to deploy the various buoys making up the IBO.\u00a0 A NOAA\/PMEL Weatherex buoy and US Army CRREL Ice Mass Balance (IMB) buoy were installed on the 23<sup>rd<\/sup>\u00a0and 24<sup>th<\/sup>\u00a0of April. The morning after the IMB was installed, a crack formed directly through the IMB buoy hull (and the ice camp runway as well).\u00a0 Fortunately, the crack in the runway healed itself, and the IMB canister was redeployed by removing it from the crack and inserting into an adjacent new hole, without removing any sensor wires.<\/p>\r\n<p>After several days of weather delays, on April 27 the remainder of the deployment team and the ITP and AOFB buoys arrived.\u00a0 Due to the cracks that formed on the IMB and Weatherex buoy site, an alternate site was chosen for the rest of the buoys.\u00a0 Nothing near the camp was better than the existing site, so a 2.5 m ice floe over 1 km away was selected requiring snowmobiles for transport to the site.\u00a0 The ITP deployment the next morning concluded successfully in just less than 4 hours, with a few minor difficulties due to the cold air temperatures (-15 C).\u00a0 In particular, trouble keeping a laptop computer drive warm made communicating with the surface electronics difficult during testing before deployment.\u00a0 Meanwhile, a meteorological package installed by the\u00a0<a href=\"http:\/\/www.climatechangecollege.org\/\">Climate Change College<\/a>\u00a0was installed nearby.\u00a0 In the afternoon the AOFB sensor package was installed about 10 m away with a wind generator to provide additional power for fast sampling during windy periods.<\/p>\r\n<p>Coverage leading up to the deployment is also available at:\u00a0<a href=\"http:\/\/polardiscovery.whoi.edu\/expedition1\/journal-day10.html\">http:\/\/polardiscovery.whoi.edu\/expedition1\/journal-day10.html<\/a>, and field reports from NPEO at\u00a0<a href=\"http:\/\/psc.apl.washington.edu\/northpole\/NP2007Reports.html\">http:\/\/psc.apl.washington.edu\/northpole\/NP2007Reports.html<\/a>.<\/p>\r\n\t\t\t\t<a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1804_120436.jpg\" target=\"_self\" rel=\"noopener noreferrer\">\r\n\t\t\t\t<img loading=\"lazy\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1804_120436.jpg\" alt=\"The installation site with working tent for the first half of the IBO (including IMB and Weatherex) on April 23, 2007.\" height=\"2112\" width=\"2816\" title=\"DSCN1804_120436\" \/>\r\n\t\t\t\t<\/a>\r\n\t\tThe installation site with working tent for the first half of the IBO (including IMB and Weatherex) on April 23, 2007.  In the background are the tents making up ice camp Barneo and the Twin Otter aircraft parked on the runway.\r\n\t\t\t\t<a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1851_120438.jpg\" target=\"_self\" rel=\"noopener noreferrer\">\r\n\t\t\t\t<img loading=\"lazy\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1851_120438.jpg\" alt=\"Kris Newhall operates the chainfall, while Sergey Pisarev maneuvers a motor driven auger to drill a 10.5&quot; diameter hole through the 2.5 m thick icefloe\" height=\"2112\" width=\"2816\" title=\"DSCN1851_120438\" \/>\r\n\t\t\t\t<\/a>\r\n\t\tKris Newhall operates the chainfall, while Sergey Pisarev maneuvers a motor driven auger to drill a 10.5&#8243; diameter hole through the 2.5 m thick icefloe for deploying the ITP profiler mooring on the morning of April 28.\r\n\t\t\t\t<a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1853_120440.jpg\" target=\"_self\" rel=\"noopener noreferrer\">\r\n\t\t\t\t<img loading=\"lazy\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1853_120440.jpg\" alt=\"Newhall spools out the 790 m of mooring wire using the specially designed winch\" height=\"2112\" width=\"2816\" title=\"DSCN1853_120440\" \/>\r\n\t\t\t\t<\/a>\r\n\t\tNewhall spools out the 790 m of mooring wire using the specially designed winch, which operates on gravity alone.\r\n\t\t\t\t<a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1854_120442.jpg\" target=\"_self\" rel=\"noopener noreferrer\">\r\n\t\t\t\t<img loading=\"lazy\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1854_120442.jpg\" alt=\"A grip is wrapped on the wire rope by Pisarev and Newhall.\" height=\"2112\" width=\"2816\" title=\"DSCN1854_120442\" \/>\r\n\t\t\t\t<\/a>\r\n\t\tTo take the tension from the winch for installing the surface floatation package, a grip is wrapped on the wire rope by Pisarev and Newhall.\r\n\t\t\t\t<a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1859_120444.jpg\" target=\"_self\" rel=\"noopener noreferrer\">\r\n\t\t\t\t<img loading=\"lazy\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1859_120444.jpg\" alt=\"The sensor package for the AOFB buoy consisting of fast response temperature, conductivity and an acoustic current profiler is prepared for deployment by Rick Krishfield.\" height=\"2112\" width=\"2816\" title=\"DSCN1859_120444\" \/>\r\n\t\t\t\t<\/a>\r\n\t\tThe sensor package for the AOFB buoy consisting of fast response temperature, conductivity and an acoustic current profiler is prepared for deployment by Rick Krishfield.\r\n\t\t\t\t<a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1861_120446.jpg\" target=\"_self\" rel=\"noopener noreferrer\">\r\n\t\t\t\t<img loading=\"lazy\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1861_120446.jpg\" alt=\"Newhall connects an external wind generator\" height=\"2112\" width=\"2816\" title=\"DSCN1861_120446\" \/>\r\n\t\t\t\t<\/a>\r\n\t\tAfter the AOFB has been installed, Newhall connects an external wind generator to provide additional power for increased sampling by the AOFB between regular battery powered intervals.\r\n\t\t\t\t<a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1863_120448.jpg\" target=\"_self\" rel=\"noopener noreferrer\">\r\n\t\t\t\t<img loading=\"lazy\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2019\/08\/DSCN1863_120448.jpg\" alt=\"IBO\" height=\"2112\" width=\"2816\" title=\"DSCN1863_120448\" \/>\r\n\t\t\t\t<\/a>\r\n\t\tInstalled 1 km away from Barneo and several days later, the second half of the IBO consists of the ITP, a meteorological package installed by the <a href=\"http:\/\/www.climatechangecollege.org\/\">Climate Change College<\/a>, and AOFB with wind generator.\r\n","protected":false},"excerpt":{"rendered":"<p>ITP 7 Deployment Operations The first ITP deployed in the Eurasian side of the Arctic Ocean was installed as part of a buoy cluster (or Ice Based Observatory) as a component of the 2007 NPEO.\u00a0 As in previous years, NPEO operated from the Russian ice camp Barneo, which is installed every March-April primarily for commercial&hellip;<\/p>\n","protected":false},"author":83,"featured_media":0,"parent":1119,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"tpl-sidebar.php","meta":{"advanced-sidebar-menu\/link-title":"","advanced-sidebar-menu\/exclude-page":false},"_links":{"self":[{"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages\/1124"}],"collection":[{"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/users\/83"}],"replies":[{"embeddable":true,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/comments?post=1124"}],"version-history":[{"count":3,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages\/1124\/revisions"}],"predecessor-version":[{"id":3425,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages\/1124\/revisions\/3425"}],"up":[{"embeddable":true,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages\/1119"}],"wp:attachment":[{"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/media?parent=1124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}