{"id":5253,"date":"2024-03-12T11:46:45","date_gmt":"2024-03-12T15:46:45","guid":{"rendered":"https:\/\/www2.whoi.edu\/site\/itp\/?page_id=5253"},"modified":"2024-07-11T11:05:24","modified_gmt":"2024-07-11T15:05:24","slug":"itp88-deployment","status":"publish","type":"page","link":"https:\/\/www2.whoi.edu\/site\/itp\/data\/completed-missions\/itp88-overview\/itp88-deployment\/","title":{"rendered":"ITP 088 Deployment"},"content":{"rendered":"\r\n<h1>ITP 88 Deployment<\/h1>\r\n<p>ITP 88 was deployed as part of the first Ice-Based Observatory installed during JOIS 2015.\u00a0 Due to the thin ice conditions, reconnaissance operations took 2 days to locate a suitable ice floe and weather limited daylight conditions constraining the operations.\u00a0 Not including the time to reconnaissance, drill and select the ice floe, the deployment operation took 6 hours, including transportation of gear and personnel each way to the site.\u00a0 Ice analyses were also performed by others in the science party while the IBO deployment operations took place.\u00a0 Unfortunately, while transporting back some of the deployment gear to the ship at the end of the deployment, the helicopter sling load shifted so was released for safety, and the equipment was onto the floe damaging some of the gear.<\/p>\r\n<p>More information and photos on the deployment operations are also available at: <a href=\"https:\/\/archives.whoi.edu\/beaufortgyre\/www.whoi.edu\/page.do@pid=147796.html\">https:\/\/archives.whoi.edu\/beaufortgyre\/www.whoi.edu\/page.do@pid=147796.html<\/a><\/p>\r\n<p><a href=\"https:\/\/www2.whoi.edu\/site\/itp\/data\/completed-missions\/itp88-overview\/itp88-data-processing\/\">Data Processing<\/a><\/p>\r\n<p><a href=\"https:\/\/www2.whoi.edu\/site\/itp\/data\/completed-missions\/itp88-overview\/itp88-final-data\/\">Final data<\/a><\/p>\r\n<p><a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/GEM_3715s.jpg\" target=\"_self\" rel=\"noopener\"> <img src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/GEM_3715s.jpg\" alt=\"John Kemp and Andy Davies auger 11.5\" \/> <\/a> John Kemp and Andy Davies auger 11.5&#8243; diameter ice hole for ITP deployment. (photo by Gary Morgan) <a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/DSCN1524-scaled.jpg\" target=\"_self\" rel=\"noopener\"> <img loading=\"lazy\" title=\"DSCN1524\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/DSCN1524-scaled.jpg\" alt=\"Jeff O'Brien prepares ITP profiler for deployment.  (Photo by Rick Krishfield)\" width=\"2560\" height=\"1920\" \/> <\/a> Jeff O&#8217;Brien prepares ITP profiler for deployment. (Photo by Rick Krishfield) <a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/DSCN1526-scaled.jpg\" target=\"_self\" rel=\"noopener\"> <img loading=\"lazy\" title=\"DSCN1526\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/DSCN1526-scaled.jpg\" alt=\"Gary Morgan and John Kemp attached ITP profiler to the wire.  (Photo by Rick Krishfield)\" width=\"1920\" height=\"2560\" \/> <\/a> Gary Morgan and John Kemp attached ITP profiler to the wire. (Photo by Rick Krishfield) <a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/GEM_3813s.jpg\" target=\"_self\" rel=\"noopener\"> <img loading=\"lazy\" title=\"GEM_3813s\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/GEM_3813s.jpg\" alt=\"Kemp and Davies attach surface package to tether prior to installation. (photo by Gary Morgan)\" width=\"934\" height=\"1056\" \/> <\/a> Kemp and Davies attach surface package to tether prior to installation. (photo by Gary Morgan) <a href=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/jois2015ibo1.jpg\" target=\"_self\" rel=\"noopener\"> <img loading=\"lazy\" title=\"jois2015ibo1\" src=\"https:\/\/www2.whoi.edu\/site\/itp\/wp-content\/uploads\/sites\/92\/2024\/03\/jois2015ibo1.jpg\" alt=\"Photo of the first IBO deployed during JOIS 2015. (photo by Rick Krishfield) \" width=\"960\" height=\"720\" \/> <\/a> Photo of the first IBO deployed during JOIS 2015. (photo by Rick Krishfield)<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>ITP 88 Deployment ITP 88 was deployed as part of the first Ice-Based Observatory installed during JOIS 2015.\u00a0 Due to the thin ice conditions, reconnaissance operations took 2 days to locate a suitable ice floe and weather limited daylight conditions constraining the operations.\u00a0 Not including the time to reconnaissance, drill and select the ice floe,&hellip;<\/p>\n","protected":false},"author":188,"featured_media":0,"parent":5240,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"tpl-sidebar.php","meta":{"advanced-sidebar-menu\/link-title":"ITP 088 Deployment","advanced-sidebar-menu\/exclude-page":false},"_links":{"self":[{"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages\/5253"}],"collection":[{"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/users\/188"}],"replies":[{"embeddable":true,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/comments?post=5253"}],"version-history":[{"count":3,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages\/5253\/revisions"}],"predecessor-version":[{"id":5592,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages\/5253\/revisions\/5592"}],"up":[{"embeddable":true,"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/pages\/5240"}],"wp:attachment":[{"href":"https:\/\/www2.whoi.edu\/site\/itp\/wp-json\/wp\/v2\/media?parent=5253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}