Deployment of ITPs 1 and 3

ITP numbers 1 and 3 were deployed in August 2005 in the Beaufort Gyre, as part of the Beaufort Gyre Exploration Program from the Canadian Coast Guard Icebreaker Louis S. St-Laurent. The deployments are described here: "Cruise – 2005 Dispatches – Dispatch 15" and"Cruise - 2005 Dispatches - Dispatch 23".

ITP 1 was deployed on August 15, 2005 at 78.9 N, 150.3 W.  ITP 1 and US Army Cold Regions Research and Engineering Laboratory (CRREL) Ice Mass Balance Buoy (IMB 07949) were deployed on a 4.6 m thick multiyear ice floe. The ITP operated on a sample schedule of 4 one-way profiles between 10 and 760 m depth each day until 8 January 2007, when the profiler memory was filled with 2042 profiles. The unit was retrieved on 8 August 2007 at 74.7 N, 151.4 W.

ITP 3 was deployed on August 23, 2005 at 77.6 N, 142.2 W. ITP 3 and US Army Cold Regions Research and Engineering Laboratory (CRREL) Ice Mass Balance Buoy (IMB 07950) were deployed on a 3.5 m thick multiyear ice floe. The ITP operated on a sample schedule of 4 one-way profiles between 10 and 760 m depth each day until 10 September 2006 when the unit was damaged during an attempted recovery operation near 74.3 N, 135.2 W.

Assembly of the ITP.
Installation of the ITP.
Scroll To Top