Skip to content

Putting it all together

Credit: Ed Dever, Oregon State University

From left to right Stuart Pearce, Steve Lambert, and Kristin Politano connect the electrical-mechanical (EM) chain at the base of the Washington shelf buoy.  Before deployment, the mooring is connected from top to bottom, and instruments are turned on and tested.