Skip to content

Gallery

All
  • All
  • Endurance 16
  • Endurance 17
  • Endurance 18
  • Endurance 19
  • Endurance 20
  • Irminger 10
  • Irminger 11
  • Irminger 9
  • Pioneer 17
  • Pioneer 18
  • Pioneer 19
  • Pioneer 21
  • Pioneer MAB At-Sea Tests
  • Pioneer MAB Initial Deployment
  • Pioneer MAB Test Deployment
  • RCA VISIONS 22
  • RCA VISIONS 23
  • RCA VISIONS 24
  • Station Papa 10
  • Station Papa 11
  • Station Papa 9

The Endurance 16 team deploys enough equipment on the Endurance mooring cruises that they have a port stop to unload…

For OOI Endurance mooring operations, the team relies on the excellent lifting equipment offered by the R/V Sikuliaq.  Here a…

On this cruise, most of the work occurs on deck as the team deploys and recovers oceanographic moorings. However, at…

Each OOI oceanographic mooring carries more than 20 sensors and takes months to prepare for deployment. To make sure everything…

Spring in the North Pacific can bring pretty high winds and seas.  When the Endurance 16 team gets good weather,…

The Endurance 16 OOI science party and R/V Sikuliaq crew deploy the Washington shelf mooring.  The new mooring will sit…

  The Endurance 16 team completed its first operation of the Spring 2022 OOI Endurance cruise. Here Linus Stoltz (left)…

From left to right Stuart Pearce, Steve Lambert, and Kristin Politano connect the electrical-mechanical (EM) chain at the base of…

The deck of R/V Sikuliaq on day 2 of loading for OOI Endurance 16 cruise.  Most of the gear the…

This image shows nearly all the equipment that comprises a typical sediment trap mooring.  Syntactic buoys (yellow balls on left…

 

All images and videos are available for public use with the following acknowledgement: "Image (video) from work supported by the National Science Foundation Ocean Observatories Initiative, a major facility fully funded by the NSF." If an image is copyrighted, please include the copyright information at the end of this acknowledgement.