Moorings Tested and Assembled
Following the loading of the equipment on the RV Sikuliaq, the moorings are assembled and tested during the transit to the Station Papa site.
Following the loading of the equipment on the RV Sikuliaq, the moorings are assembled and tested during the transit to the Station Papa site.