Safe and Sound
Here the test Coastal Surface Mooring is safely on deck after ~8 months operating at the proposed Pioneer Mid-Atlantic Bight location. The mooring was deployed in a water depth of 30m and survived storms with max wave heights of 7.5-10m, and continued to send data to shore!