Skip to content

Sunrise over the Multi-Function Node

The OOI-CGSN team on the RV Neil Armstrong is in transit to the test mooring deployment sites.  The Multi-Function Node is deployed with the Coastal Surface Mooring and provides a platform for seabed measurements like turbidity, dissolved oxygen, pH, salinity, temperature, pressure, currents.

Read More

Out of Drydock

The RV Neil Armstrong was floated out of drydock and is now ready to go!  The team departed on the Pioneer MAB test mooring and mapping cruise on Feb. 21st and will be offshore for approximately one week.  They will map the seabed using sonar, perform ROV visual inspections, and deploy two test moorings.

Read More

A View From Below

Not a view many get to see!  Chief Engineer Pete Marczak waving from the stern and Irene Duran, Jennifer Batryn, and Dee Emrich standing in the Charleston, SC drydock give a good sense of the size of the RV Neil Armstrong below the waterline.

Read More

Moving Quickly

The mobilization of the Pioneer MAB test moorings is moving quickly thanks to the expertise of the OOI-CGSN team, the crew of the Armstrong, and the support of the dockyard.  The buoy builds are complete and the profiler and surface buoys were moved to the ship.

Read More

Assembly Complete

Jim Ryder and Kris Newhall complete assembly of At-Sea Test 3 surface buoy to be deployed at new Pioneer Mid-Atlantic Bight location this month.  The test moorings will confirm the design of the systems to be implemented within the new array in Spring 2024.

Read More

Well and Tower Preparations

The OOI-CGSN team members Alex Franks and Jared Schwartz, with dockyard support, prepare the At-Sea Test 3 surface mooring well and tower for integration into the buoy.    

Read More

Moving Parts

The RV Neil Armstrong crew move the buoy frame and buoyancy foam for the At-Sea Test 3 surface mooring from the ship to the dock in Charleston, SC.  At-Sea Test 3 is the deployment of test moorings at the new OOI Pioneer Mid-Atlantic Bight location.

Read More

Double Duty

Doing two things at once.  The R/V Neil Armstrong is in a Charleston, SC drydock for inspection and also supporting the mobilization of the At-Sea Test 3 surface and profiler buoys for OOI-CGSN.

Read More

Hull Inspection

The R/V Neil Armstrong in dry-dock for hull inspection prior to departing for the Pioneer MAB test cruise. Shipyard workers, crew, and the science party are able to access the ship for preparations.

Read More

Coastal Pioneer Array MAB

Schematic drawing of the Pioneer Mid-Atlantic Bight (MAB) moored array to be deployed off the coast of Nags Head, North Carolina. The full array, to be deployed in the spring of 2024, will consist of ten moorings at seven different sites (three sites contain mooring pairs). For the test deployment, one Coastal Surface Mooring will…

Read More