Skip to content

Armstrong on the Way

The OOI-Coastal and Global Scale Node (CGSN) team will deploy the Shallow Water Mooring south of Martha’s Vineyard enroute to the proposed Pioneer Mid-Atlantic Bight (MAB) location.  Once at Pioneer MAB, they will recover the test Coastal Surface Mooring after 8 months collecting engineering data.  They will also perform surveys and ROV inspections of potential…

Read More

Loaded and Ready to Go!

The Shallow Water Mooring has been loaded on the R/V Neil Armstrong and fully integrated.  This means the buoy, riser, multi-function node, and profiling vehicle are complete, operating, and transmitting test data.  The system will operate right up until departure to ensure all systems are ready for deployment.

Read More

Safety First

Safety is always a key aspect of going to sea.  One of the first things we do is have a safety drill so that we understand what the different ship alarms mean, where we need to muster in the case of an emergency, and how to don and use our personal protective equipment.  Science party…

Read More

Preparing the Test Mooring

At-Sea Test 4 cruise will include the first deployment of new Shallow Water Mooring (SWM) components. The mooring will be deployed for a few months to test the seabed multifunction node, buoyant stretch hose, riser cable, and Prawler profiling vehicle. Engineering data will be collected and assessed prior to deployment at the proposed Pioneer Mid-Atlantic…

Read More

Coastal Pioneer Array MAB

Schematic drawing of the Pioneer Mid-Atlantic Bight (MAB) moored array to be deployed off the coast of Nags Head, North Carolina. The full array, to be deployed in the spring of 2024, will consist of ten moorings at seven different sites (three sites contain mooring pairs). For the test deployment, one Coastal Surface Mooring will…

Read More