Skip to content

Weather Delays

By: Darlene Trewcrist  |  September 1, 2023

Credit: UW/NSF-OOI/WHOI, J2-1542, V23.

August 31, 2023: Due to weather considerations, the R/V Thomas G. Thompson has postponed its departure for Leg 3 of RCA operations. The new plan is to leave the dock at ~1400 September 1. Stay tuned.  In the meantime, enjoy an image of stunning soft coral that grows on the carbonate deposit called Pinnacle at Southern Hydrate Ridge.

Posted in

Recent Updates