
Credit: NSF-OOI/UW/CSSF/V22.

Credit: NSF-OOI/UW/CSSF/V22.
Recovery of the OOI Cabled Slope Base Shallow Profiler mooring. The platform normally sits at 200m depth, stable instruments on one side and the profiler pod and winch on the other. The mooring is being turned for the first time since deployment in 2014!
Posted in RCA VISIONS 22
Recent Updates