Skip to content

First of First

This morning, April 3, 2024, marked the beginning of the Coastal Pioneer Array in its new location in the Mid-Atlantic Bight.  The team began prepping for the deployment of the Central Surface Mooring (CNSM-1) at 6 am Eastern.  The mooring was in the water and its instruments functioning shortly after 9 am.  Well done, team!

Read More

CTD Casts While Underway

  During transit to the Mid-Atlantic Bight from Woods Hole, the team conducted CTD sampling to continue the work of The Northeast U.S. Shelf (NES) Long-Term Ecological Research (LTER), which strives to understand and predict how planktonic food webs are changing in the region and possible impacts on higher trophic levels.

Read More

Secure Back Deck

  The R/V Neil Armstrong is fully loaded with ocean observing equipment for the first deployment of the Coastal Pioneer Array at the Mid-Atlantic Bight.  To ensure all equipment stays in place, regardless of conditions, the ship’s back deck has holes drilled into the floor that allows the team to securely fasten and tie-down the…

Read More

Survival Suit Training

Safety training happens as soon as the ship is underway. Here Andy Robinson dons a survival suit and demonstrates how to get air out of it for maximum effectiveness.

Read More

And We’re Off!

IMG_9893 And we are off! The Coastal and Global Scale Nodes team is aboard the R/V Neil Armstrong headed to the Mid-Atlantic Bight for the first deployment of the Pioneer Array there. This is the view from the ship as we head to sea for the next 10 days.

Read More

Loading Complete

Pioneer MAB surface moorings and vehicles were loaded on the RV Neil Armstrong.  The team setup the moorings for deployment, verified instrument operation, and prepared the shipboard labs for cruise operations.  

Read More

Prawler Testing Completed

The CGSN team monitors the testing and burn-in of the Pioneer MAB Prawler profiling vehicle, the Shallow Water Mooring controller and towers.  The testing will confirm that the vehicle is successfully communicating inductively to the controller, and the controller is telemetering the data to shore.    

Read More

Team Effort

It is definitely a team effort!  Chris Basque, Eric Hutt, John Jordan, John Kemp, Matt Latvis, Nico Llanos, Kris Newhall, Jim Ryder all on deck completing the connections of the electromechanical chains and stretch hoses to the surface moorings and Near-Surface Instrument Frames.  

Read More

Assembling Anchor Recovery Module

Meghan Donohue assembles an Anchor Recovery Module (ARM).  The ARM includes the anchor for the Multi-Function Node (MFN) as well as a flotation module and recovery line.  The flotation module and recovery line allow the MFN anchor to be recovered, leaving nothing behind, and minimizing the impact to the seabed environment.    

Read More

Tower Assembly

John Lund and Mike McCarthy assemble the tower for the new Pioneer MAB Shallow Water Mooring.  The tower will hold data telemetry modules and aids to navigation such as GPS, lights, and radar reflectors.  

Read More