- All
- Endurance 16
- Endurance 17
- Endurance 18
- Endurance 19
- Endurance 20
- Endurance 21
- Endurance 22
- Endurance 23
- Irminger 10
- Irminger 11
- Irminger 12
- Irminger 9
- Pioneer 17
- Pioneer 18
- Pioneer 19
- Pioneer 21
- Pioneer 22
- Pioneer 23
- Pioneer MAB At-Sea Tests
- Pioneer MAB Initial Deployment
- Pioneer MAB Test Deployment
- RCA VISIONS 22
- RCA VISIONS 23
- RCA VISIONS 24
- RCA VISIONS 25
- RCA VISIONS 26
- Station Papa 10
- Station Papa 11
- Station Papa 12
- Station Papa 9
August 27, 2023: The team arrived at Southern Hydrate Ridge on schedule (~0600). During dive J2-1536, Jason swapped out junction…
August 26, 2023: Just as the team was about to get underway to Southern Hydrate Ridge, a call came in…
Everything is loaded and the team is ready to go. The Global Surface Mooring, the largest Irminger Mooring, is placed…
It can be a tight fit. Before loading, the Global Surface Buoy must be assembled, and instruments mounted and cabled. …
The R/V Neil Armstrong has arrived in Reykjavik! The team has started loading all the Irminger materials onto the vessel….
August 25th, 2023: The team is now at Axial Base. ROV Jason was launched on dive J2-1530 to cut the…
Once the mooring build is complete, the mobilization team can focus on the mobile assets. Three gliders are planned for…
The Irminger cruise team continues to make progress building the moorings in Reykjavik, Iceland. The mooring systems are integrated and…
All images and videos are available for public use with the following acknowledgement: "Image (video) from work supported by the National Science Foundation Ocean Observatories Initiative, a major facility fully funded by the NSF." If an image is copyrighted, please include the copyright information at the end of this acknowledgement.


