ITP-V 114 was deployed during the second ice station of the USCGC Healy's HLY1902 cruise. Ice draft was about 0.8m. This station was significantly shorter than the first one a couple days earlier as only a WHOI acoustic modem buoy was deployed in addition to the ITP-V. The ITP system was installed in record time as folks had selected and mastered specific tasks of the multi-staged deployment during the first deployment just a short while ago. An Artic Drifter (SVP) was placed on the ice as the last step before departing.
![DSC_0394 Auguring the 24” hole for ITP-V deployment. (Photo by Frank Bahr)](https://www2.whoi.edu/site/itp/wp-content/uploads/sites/92/2024/09/DSC_0394-scaled.jpg)
Auguring the 24” hole for ITP-V deployment. (Photo by Frank Bahr)
![DSC_0442 John Kemp attaches clamp to profiler on the wire. (Photo by ENS Layman)](https://www2.whoi.edu/site/itp/wp-content/uploads/sites/92/2024/09/DSC_0442-scaled.jpg)
John Kemp attaches clamp to profiler on the wire. (Photo by ENS Layman)