Skip to content

ITP 75 Deployment operations

The deployment for ITP 75 was rather straight-forward and went very quickly. The floe was large with minimal ridging and no rafting was detected during test drilling.

The crew installs the spool onto the winch. Photo Andrey Masanov
John Kemp and Peter Keen drill through the ice floe. Photo by Andrey Masanov
Kemp and Steve Lambert attach ITP75 to the mooring wire. Photo by Andrey Masanov
The work site with Akademik Fedorov in the background. Photo by Andrey Masanov
Carlton Rauschenberg and Lambert mate the surface package to the mooring. Photo by Andrey Masanov
The crew return to the ship. Photo by Andrey Masanov
Scroll To Top