ITP 5 Deployment Operations
An attempt to deploy ITP 5 on August 31, 2006 had to be aborted after the anchor was lowered through a 10 inch diameter hole in a 3.4 m thick ice floe. The anchor wedged under a floe rafted beneath the first, and eventually the end of the tether wire had to be cut to recover the rest of the mooring hardware. A replacement anchor was modified from 250 lb of used mooring chain so that a week later the system could be deployed on a small 3.1 m thick ice floe in loose ice conditions. In an afternoon operation just over 3 hours, an ice floe was surveyed and selected, the gear transported, ITP 5 installed and inductive modem communications with the profiler verified while still on the ice.
More information and photos on the deployment operation are also available here and at: https://www.whoi.edu/page.do?pid=68056.