Skip to content

ITP 94 Deployment

ITP 94 was the second ITP deployed during the MOSAiC expedition at distributed network site L2 from the Russian Research Vessel Federov. Conditions were covered sky, -7.8 C, 94% relative humidity, air pressure of 1020.9 kPa, with a wind speed of 1.3 m/s.  The site was chosen and mapped out the day prior, all the holes for deployments were drilled as well. With all of the drilling completed the day before we were looking at an estimated four-hour deployment. The skies were grey and cloudy with occasional snowfall and fog limiting visibility. The ice was not very thick throughout the entire floe and the thickest we could find was about a meter.

This ITP was deployed as a part of the MOSAiC expedition Distributed Network, including an AOFB, Met Sled, Snow Buoy, and SIMB.  During the ITP deployment, installations of the AOFB, Met Sled, and SIMB were conducted by different teams while other scientists surveyed the icefloe. Roughly four hours after operations commenced all of the gear was repacked and reloaded onboard the Akademik Fedorov.

Data Processing

Final Data

ITP anchors are connected to wire and deployment commences. (Photo by Andy Davies)
ITP anchors are connected to wire and deployment commences. (Photo by Andy Davies)
ITP is clamped to wire and ready to be deployed. (Photo by Andy Davies)
ITP is clamped to wire and ready to be deployed. (Photo by Andy Davies)
Inductive testing of instrumentation prior to deployment. (Photo by Andy Davies)
Inductive testing of instrumentation prior to deployment. (Photo by Andy Davies)
Andrew Davies and Chris Basque mount a Yale Grip to mooring wire to transfer the load from the winch to the tripod. (Photo by Andy Davies)
Andrew Davies and Chris Basque mount a Yale Grip to mooring wire to transfer the load from the winch to the tripod. (Photo by Andy Davies)
The surlyn foam top float is moved over the hole. (Photo by Andy Davies)
The surlyn foam top float is moved over the hole. (Photo by Andy Davies)
Andrew Davies performs final comms check prior to deployment clean-up. (Photo by Andy Davies)
Andrew Davies performs final comms check prior to deployment clean-up. (Photo by Andy Davies)
Scroll To Top